The Journal for Public Infrastructure

Pipeline

   

Home

 
A Baton Rouge Emergency
Sinkhole repair is complicated by above- and below-ground utilities.

Long Term Plan to Reduce I/I
 

Utility Looks for Leaks
Historic utility uses the latest technology to pinpoint problems.

Sliplining in San Antonio
City crews decide to do it themselves.

Relief for an Interceptor
Pro-active plan will accommodate future flows.

Pipe Material Options for
Pipe Bursting

Manufacturers are seeking ways to adapt their pipe to pipe bursting installations.

Major Infrastructure Project
Includes Pipe Jacking

Relocating over 5,000 feet of 60-inch interceptor.

Protecting Little
Walnut Creek

A long buried problem is solved with tunneling and boring.

Ready by Kickoff
Major downtown renovations had to be completed in time for Super Bowl XXXIX.

Glass Reinforced Plastic Panels Rehabilitate Century Old Sewer
Fort Wayne, IN, faces the challenge and expense of maintaining an aging sewer system.

Florida County Solves II Problem

More than 6,000 linear feet of 8-and 10-in.pipe required repair to reduce infiltration and inflow.

 

HDPE Pipe Moves Missouri Highway Expansion Ahead
Pro-active citizenry serves as catalyst..

Horizontal Drilling Project Replaces Park Water Line

The completion of the longest horizontal drilling project of its kind will assure the water supply for Mesa Verde National Park.

Bike Path Conceals New Recycled Water Pipeline

Redwood City's current demand for water exceeds the allocation from its sole drinking water supply source. The situation will only get worse unless the city acts now to create additional water supply.